Case Studies

Delivered projects across Scotland

Every number on this page is from a real Scottish deployment we designed, installed and continue to optimise.

2MW / 4MWh manufacturing BESS
Dundee

2MW / 4MWh manufacturing BESS

A precision engineering client in Dundee Technology Park deployed a revenue-stacked lithium iron phosphate system. We managed DNO, procurement, and commissioned the optimisation algorithm.

Annual revenue
£310,000
Peak charge saving
28%
Payback
4.6 yrs
Discuss a similar project
500 kW commercial office BESS
Edinburgh

500 kW commercial office BESS

Grade A office in Edinburgh New Town retrofit with a 500 kW / 1 MWh BESS, integrated with rooftop solar and EV charging. Full G99 consent delivered in 11 weeks.

Triad avoidance
£42k/yr
Wholesale spread
£56k/yr
DC revenue
£78k/yr
Discuss a similar project
130 kWh industrial park deployment
Aberdeen

130 kWh industrial park deployment

Former oil & gas supply chain facility converted to a low-carbon operation. Storage paired with 180 kWp canopy solar eliminated diesel standby.

Demand reduction
41%
Annual saving
£48k
Carbon
-62 tCO2
Discuss a similar project
Residential cluster - 42 homes
Glasgow

Residential cluster - 42 homes

A West End new-build development where every home was specified with a 10 kWh battery and heat pump. Shared optimisation platform delivered via Octopus Agile.

Avg household saving
£1,240/yr
Install time
14 weeks
Agile uptake
100%
Discuss a similar project